[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"i-lucide:chevron-down":3,"i-simple-icons:facebook":8,"i-simple-icons:instagram":10,"i-simple-icons:tiktok":12,"i-simple-icons:linkedin":14,"job-details-106123":17,"i-lucide:map-pin":77,"i-lucide:banknote":79,"i-lucide:calendar":81,"i-lucide:check":83,"i-lucide:heart":85,"i-lucide:share-2":87},{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":7},0,24,false,"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"m6 9l6 6l6-6\"\u002F>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":9},"\u003Cpath fill=\"currentColor\" d=\"M9.101 23.691v-7.98H6.627v-3.667h2.474v-1.58c0-4.085 1.848-5.978 5.858-5.978c.401 0 .955.042 1.468.103a9 9 0 0 1 1.141.195v3.325a9 9 0 0 0-.653-.036a27 27 0 0 0-.733-.009c-.707 0-1.259.096-1.675.309a1.7 1.7 0 0 0-.679.622c-.258.42-.374.995-.374 1.752v1.297h3.919l-.386 2.103l-.287 1.564h-3.246v8.245C19.396 23.238 24 18.179 24 12.044c0-6.627-5.373-12-12-12s-12 5.373-12 12c0 5.628 3.874 10.35 9.101 11.647\"\u002F>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":11},"\u003Cpath fill=\"currentColor\" d=\"M7.03.084c-1.277.06-2.149.264-2.91.563a5.9 5.9 0 0 0-2.124 1.388a5.9 5.9 0 0 0-1.38 2.127C.321 4.926.12 5.8.064 7.076s-.069 1.688-.063 4.947s.021 3.667.083 4.947c.061 1.277.264 2.149.563 2.911c.308.789.72 1.457 1.388 2.123a5.9 5.9 0 0 0 2.129 1.38c.763.295 1.636.496 2.913.552c1.278.056 1.689.069 4.947.063s3.668-.021 4.947-.082c1.28-.06 2.147-.265 2.91-.563a5.9 5.9 0 0 0 2.123-1.388a5.9 5.9 0 0 0 1.38-2.129c.295-.763.496-1.636.551-2.912c.056-1.28.07-1.69.063-4.948c-.006-3.258-.02-3.667-.081-4.947c-.06-1.28-.264-2.148-.564-2.911a5.9 5.9 0 0 0-1.387-2.123a5.9 5.9 0 0 0-2.128-1.38c-.764-.294-1.636-.496-2.914-.55C15.647.009 15.236-.006 11.977 0S8.31.021 7.03.084m.14 21.693c-1.17-.05-1.805-.245-2.228-.408a3.7 3.7 0 0 1-1.382-.895a3.7 3.7 0 0 1-.9-1.378c-.165-.423-.363-1.058-.417-2.228c-.06-1.264-.072-1.644-.08-4.848c-.006-3.204.006-3.583.061-4.848c.05-1.169.246-1.805.408-2.228c.216-.561.477-.96.895-1.382a3.7 3.7 0 0 1 1.379-.9c.423-.165 1.057-.361 2.227-.417c1.265-.06 1.644-.072 4.848-.08c3.203-.006 3.583.006 4.85.062c1.168.05 1.804.244 2.227.408c.56.216.96.475 1.382.895s.681.817.9 1.378c.165.422.362 1.056.417 2.227c.06 1.265.074 1.645.08 4.848c.005 3.203-.006 3.583-.061 4.848c-.051 1.17-.245 1.805-.408 2.23c-.216.56-.477.96-.896 1.38a3.7 3.7 0 0 1-1.378.9c-.422.165-1.058.362-2.226.418c-1.266.06-1.645.072-4.85.079s-3.582-.006-4.848-.06m9.783-16.192a1.44 1.44 0 1 0 1.437-1.442a1.44 1.44 0 0 0-1.437 1.442M5.839 12.012a6.161 6.161 0 1 0 12.323-.024a6.162 6.162 0 0 0-12.323.024M8 12.008A4 4 0 1 1 12.008 16A4 4 0 0 1 8 12.008\"\u002F>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":13},"\u003Cpath fill=\"currentColor\" d=\"M12.525.02c1.31-.02 2.61-.01 3.91-.02c.08 1.53.63 3.09 1.75 4.17c1.12 1.11 2.7 1.62 4.24 1.79v4.03c-1.44-.05-2.89-.35-4.2-.97c-.57-.26-1.1-.59-1.62-.93c-.01 2.92.01 5.84-.02 8.75c-.08 1.4-.54 2.79-1.35 3.94c-1.31 1.92-3.58 3.17-5.91 3.21c-1.43.08-2.86-.31-4.08-1.03c-2.02-1.19-3.44-3.37-3.65-5.71c-.02-.5-.03-1-.01-1.49c.18-1.9 1.12-3.72 2.58-4.96c1.66-1.44 3.98-2.13 6.15-1.72c.02 1.48-.04 2.96-.04 4.44c-.99-.32-2.15-.23-3.02.37c-.63.41-1.11 1.04-1.36 1.75c-.21.51-.15 1.07-.14 1.61c.24 1.64 1.82 3.02 3.5 2.87c1.12-.01 2.19-.66 2.77-1.61c.19-.33.4-.67.41-1.06c.1-1.79.06-3.57.07-5.36c.01-4.03-.01-8.05.02-12.07\"\u002F>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":15,"hidden":16},"\u003Cpath fill=\"currentColor\" d=\"M20.447 20.452h-3.554v-5.569c0-1.328-.027-3.037-1.852-3.037c-1.853 0-2.136 1.445-2.136 2.939v5.667H9.351V9h3.414v1.561h.046c.477-.9 1.637-1.85 3.37-1.85c3.601 0 4.267 2.37 4.267 5.455v6.286zM5.337 7.433a2.06 2.06 0 0 1-2.063-2.065a2.064 2.064 0 1 1 2.063 2.065m1.782 13.019H3.555V9h3.564zM22.225 0H1.771C.792 0 0 .774 0 1.729v20.542C0 23.227.792 24 1.771 24h20.451C23.2 24 24 23.227 24 22.271V1.729C24 .774 23.2 0 22.222 0z\"\u002F>",true,{"@context":18,"@type":39,"@id":40,"id":41,"title":42,"slug":43,"location":44,"jobType":45,"workArrangement":46,"salaryRange":47,"showSalary":6,"category":48,"postedAt":53,"closingAt":54,"company":55,"tags":62,"description":76,"isFirstJobFriendly":6},{"@vocab":19,"hydra":20,"id":21,"title":22,"slug":23,"location":24,"jobType":25,"workArrangement":26,"salaryRange":27,"showSalary":28,"category":29,"postedAt":30,"closingAt":31,"company":32,"logo":33,"tags":34,"description":35,"applyUrl":36,"isFirstJobFriendly":37,"site":38},"https:\u002F\u002Fapp.myjob.mu\u002Fapi\u002Fdocs.jsonld#","http:\u002F\u002Fwww.w3.org\u002Fns\u002Fhydra\u002Fcore#","JobItemOutput\u002Fid","JobItemOutput\u002Ftitle","JobItemOutput\u002Fslug","JobItemOutput\u002Flocation","JobItemOutput\u002FjobType","JobItemOutput\u002FworkArrangement","JobItemOutput\u002FsalaryRange","JobItemOutput\u002FshowSalary","JobItemOutput\u002Fcategory","JobItemOutput\u002FpostedAt","JobItemOutput\u002FclosingAt","JobItemOutput\u002Fcompany","JobItemOutput\u002Flogo","JobItemOutput\u002Ftags","JobItemOutput\u002Fdescription","JobItemOutput\u002FapplyUrl","JobItemOutput\u002FisFirstJobFriendly","JobItemOutput\u002Fsite","JobItemOutput","\u002Fapi\u002F.well-known\u002Fgenid\u002Fa7678282c74aab3464fe",106123,"Site Agent\u002FAssistant Site Manager","site-agent-assistant-site-manager","Mauritius","Full-time","On-site","76,000 – 100,000",{"@type":49,"@id":50,"name":51,"slug":52},"JobCategory","\u002Fapi\u002F.well-known\u002Fgenid\u002F7218ee0f89f3b93d930e","Construction \u002F Architecture \u002F Property","construction-architecture-property","Posted Nov 16, 2026","Closing 16\u002F12\u002F2026",{"@type":56,"@id":57,"id":58,"name":59,"slug":60,"industry":51,"logo":61},"JobCompany","\u002Fapi\u002F.well-known\u002Fgenid\u002Ff438ccf58833530da23a",1015,"Zenith Contracting Ltd","zenith-contracting-ltd","https:\u002F\u002Fapp.myjob.mu\u002Fapi\u002Fjob-board\u002Ffile?filePath=client-logo\u002F8e66b52d-46f5-4c5d-b80b-dcb25c904494.png",[63,67,70,73],{"@type":64,"@id":65,"label":66},"JobTag","\u002Fapi\u002F.well-known\u002Fgenid\u002F71206a19f58ddc163ed6","Site Agent",{"@type":64,"@id":68,"label":69},"\u002Fapi\u002F.well-known\u002Fgenid\u002F620f638a409441d002e8","Assistant Manager",{"@type":64,"@id":71,"label":72},"\u002Fapi\u002F.well-known\u002Fgenid\u002Fcb1022ebef6cb295b3da","Site Management",{"@type":64,"@id":74,"label":75},"\u002Fapi\u002F.well-known\u002Fgenid\u002F1b7604f2810aaeb4a862","Project Supervisor","\u003Ch2>\u003Cstrong>\u003Cstrong>JOB DESCRIPTION – SITE AGENT (CONSTRUCTION)\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh2>\u003Cp>\u003Cstrong>\u003Cstrong>Company:\u003C\u002Fstrong>\u003C\u002Fstrong> Zenith Contracting Ltd\u003Cbr>\u003Cstrong>\u003Cstrong>Position:\u003C\u002Fstrong>\u003C\u002Fstrong> Site Agent \u002F Assistant Site Manager\u003Cbr>\u003Cstrong>\u003Cstrong>Department:\u003C\u002Fstrong>\u003C\u002Fstrong> Construction Operations\u003Cbr>\u003Cstrong>\u003Cstrong>Reports To:\u003C\u002Fstrong>\u003C\u002Fstrong> Project Manager \u002F Construction Manager \u002F Company Director\u003Cbr>\u003Cstrong>\u003Cstrong>Work Location:\u003C\u002Fstrong>\u003C\u002Fstrong> Various Construction Sites – Mauritius\u003C\u002Fp>\u003Ch2>\u003Cstrong>\u003Cstrong>1. Job Purpose\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh2>\u003Cp>We are looking for a Site Agent that shall be responsible for the day-to-day management, supervision, coordination and execution of construction activities on site, ensuring that all works are carried out in accordance with approved drawings, technical specifications, project programmes, quality standards, safety regulations and company procedures.\u003C\u002Fp>\u003Cp>The Site Agent shall ensure effective utilisation of labour, materials, plant and equipment while maintaining productivity, controlling wastage, preventing defective workmanship and achieving project deadlines within the allocated budget.\u003C\u002Fp>\u003Ch2>\u003Cstrong>\u003Cstrong>2. Main Duties and Responsibilities\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh2>\u003Ch3>\u003Cstrong>\u003Cstrong>A. Site Management and Supervision\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh3>\u003Col>\u003Cli>Manage and supervise all daily construction activities.\u003C\u002Fli>\u003Cli>Ensure that construction works are executed in accordance with approved architectural, structural and MEP drawings.\u003C\u002Fli>\u003Cli>Organise and allocate daily tasks to foremen, masons, carpenters, steel fixers, general workers and subcontractors.\u003C\u002Fli>\u003Cli>Monitor workforce productivity and ensure that daily targets are achieved.\u003C\u002Fli>\u003Cli>Ensure proper setting out, levels, dimensions and alignment before commencing any construction activity.\u003C\u002Fli>\u003C\u002Fol>\u003Ch3>\u003Cstrong>\u003Cstrong>B. Planning and Programme Management\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh3>\u003Col>\u003Cli>Prepare daily and weekly work schedules in accordance with the approved construction programme.\u003C\u002Fli>\u003Cli>Establish daily production targets for each trade.\u003C\u002Fli>\u003Cli>Monitor actual progress against planned progress.\u003C\u002Fli>\u003Cli>Identify potential delays and immediately report them to management.\u003C\u002Fli>\u003C\u002Fol>\u003Ch3>\u003Cstrong>\u003Cstrong>C. Quality Control and Workmanship\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh3>\u003Col>\u003Cli>Ensure that all construction works comply with approved drawings, specifications and accepted construction standards.\u003C\u002Fli>\u003Cli>Verify dimensions, levels, reinforcement, formwork and concrete preparation before casting.\u003C\u002Fli>\u003C\u002Fol>\u003Ch3>\u003Cstrong>\u003Cstrong>D. Materials, Procurement and Stock Control\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh3>\u003Col>\u003Cli>Identify and prepare material requirements at least \u003Cstrong>\u003Cstrong>four working days in advance\u003C\u002Fstrong>\u003C\u002Fstrong>.\u003C\u002Fli>\u003Cli>Submit material requisitions to the procurement department or management for approval.\u003C\u002Fli>\u003Cli>Ensure materials are available before the scheduled commencement of works.\u003C\u002Fli>\u003C\u002Fol>\u003Ch3>\u003Cstrong>\u003Cstrong>E. Labour Management and Productivity\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh3>\u003Col>\u003Cli>Monitor daily labour attendance and working hours.\u003C\u002Fli>\u003Cli>Allocate labour according to project priorities and required productivity.\u003C\u002Fli>\u003Cli>Ensure workers are continuously engaged in productive activities.\u003C\u002Fli>\u003C\u002Fol>\u003Ch3>\u003Cstrong>\u003Cstrong>F. Plant, Equipment and Machinery\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh3>\u003Col>\u003Cli>Coordinate the use of scaffolding, formwork, generators, concrete mixers, power tools and other construction equipment.\u003C\u002Fli>\u003Cli>Ensure equipment is operated safely and correctly.\u003C\u002Fli>\u003C\u002Fol>\u003Ch3>\u003Cstrong>\u003Cstrong>G. Health, Safety and Environmental Management\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh3>\u003Col>\u003Cli>Enforce company health and safety procedures.\u003C\u002Fli>\u003Cli>Ensure all workers use the required personal protective equipment (PPE).\u003C\u002Fli>\u003C\u002Fol>\u003Ch3>\u003Cstrong>\u003Cstrong>H. Subcontractor Coordination\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh3>\u003Col>\u003Cli>Coordinate all subcontractors working on site.\u003C\u002Fli>\u003Cli>Verify that subcontractors follow approved drawings, specifications and agreed work schedules.\u003C\u002Fli>\u003C\u002Fol>\u003Ch3>\u003Cstrong>\u003Cstrong>I. Site Documentation and Reporting\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh3>\u003Col>\u003Cli>Prepare and submit a \u003Cstrong>\u003Cstrong>Daily Site Report\u003C\u002Fstrong>\u003C\u002Fstrong> to management.\u003C\u002Fli>\u003Cli>Maintain records of labour attendance, materials received, equipment utilisation and work progress.\u003C\u002Fli>\u003Cli>Record weather conditions and any circumstances affecting productivity.\u003C\u002Fli>\u003Cli>Maintain photographic records of construction progress.\u003C\u002Fli>\u003Cli>Maintain records of site instructions and consultant communications.\u003C\u002Fli>\u003C\u002Fol>\u003Ch2>\u003Cstrong>\u003Cstrong>3. Required Qualifications and Experience\u003C\u002Fstrong>\u003C\u002Fstrong>\u003C\u002Fh2>\u003Cul>\u003Cli>Diploma or Certificate in Civil Engineering, Building Construction or Construction Management, or equivalent practical experience.\u003C\u002Fli>\u003Cli>Minimum 5 years of relevant construction site experience, preferably in residential and commercial building projects.\u003C\u002Fli>\u003Cli>Ability to read and interpret architectural, structural and MEP drawings.\u003C\u002Fli>\u003Cli>Basic computer literacy, including Microsoft Excel, Word and email.\u003C\u002Fli>\u003C\u002Ful>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":78},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"M20 10c0 4.993-5.539 10.193-7.399 11.799a1 1 0 0 1-1.202 0C9.539 20.193 4 14.993 4 10a8 8 0 0 1 16 0\"\u002F>\u003Ccircle cx=\"12\" cy=\"10\" r=\"3\"\u002F>\u003C\u002Fg>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":80},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Crect width=\"20\" height=\"12\" x=\"2\" y=\"6\" rx=\"2\"\u002F>\u003Ccircle cx=\"12\" cy=\"12\" r=\"2\"\u002F>\u003Cpath d=\"M6 12h.01M18 12h.01\"\u002F>\u003C\u002Fg>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":82},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"M8 2v3m8-3v3\"\u002F>\u003Crect width=\"18\" height=\"18\" x=\"3\" y=\"3\" rx=\"2\"\u002F>\u003Cpath d=\"M3 9h18\"\u002F>\u003C\u002Fg>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":84},"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M20 6L9 17l-5-5\"\u002F>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":86},"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M2 9.5a5.5 5.5 0 0 1 9.591-3.676a.56.56 0 0 0 .818 0A5.49 5.49 0 0 1 22 9.5c0 2.29-1.5 4-3 5.5l-5.492 5.313a2 2 0 0 1-3 .019L5 15c-1.5-1.5-3-3.2-3-5.5\"\u002F>",{"left":4,"top":4,"width":5,"height":5,"rotate":4,"vFlip":6,"hFlip":6,"body":88},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Ccircle cx=\"18\" cy=\"5\" r=\"3\"\u002F>\u003Ccircle cx=\"6\" cy=\"12\" r=\"3\"\u002F>\u003Ccircle cx=\"18\" cy=\"19\" r=\"3\"\u002F>\u003Cpath d=\"m8.59 13.51l6.83 3.98m-.01-10.98l-6.82 3.98\"\u002F>\u003C\u002Fg>"]